摘要 |
An operating time reducing method in which a processing procedure of a component mounting order determination method can be changed depending on the type of an operation loss that affects a component mounting time for mounting components onto the board is an operating time reducing method for a component mounter, wherein the method includes: an operation loss identifying step of identifying an operation loss to be resolved in the component mounter; a processing procedure selecting step of selecting, based on the identified operation loss, a processing procedure for reducing an operating time of the component mounter; and a processing procedure executing step of executing the selected processing procedure.
|