CUNSTRUCTION METHOD FOR SC STRUCTURE BY REUSEING DECK PLATE
摘要
PURPOSE: A construction method for a steel-concrete structure by the reuse of deck plates is provided to successively complete a steel-concrete structure by vertically moving deck plates and repeating the assembly and disassembly within the structure. CONSTITUTION: A construction method for a steel-concrete structure by the reuse of deck plates is as follows. Deck plates are successively arranged on the top of variable joists, whose both ends are bent downward, and connected into a large form. The variable joists are placed on separated steel beams and support the settlement of the deck plates.
申请公布号
KR20110018065(A)
申请公布日期
2011.02.23
申请号
KR20090075673
申请日期
2009.08.17
申请人
KE BAT SYSTEM. CO., LTD.;LEE, YONG HO;PARK, JUNG HO;PARK, JUNG JIN;JUNG, JOO HEE
发明人
PARK, JUNG JIN;PARK, JUNG HO;JUNG, JOO HEE;LEE, YONG HO