摘要 |
PROBLEM TO BE SOLVED: To absorb a construction error at a joint part of end flanges. SOLUTION: A filler 28 is filled between the end flanges 22A, 22B of steel members 18 adjoining in a vertical direction. The filler 28 is hardened to join the end flanges 22A, 22B. Specifically, the filler 28 is mortar, grout or an adhesive and is filled in a hole formed in each of the end flanges 22A, 22B. COPYRIGHT: (C)2011,JPO&INPIT
|