摘要 |
PROBLEM TO BE SOLVED: To quickly move a shuttering panel from a shuttering panel deconstruction floor to a shuttering panel installation floor, without affecting quality of concrete and an overall term of work. SOLUTION: This self-elevation type form device 1 is layered with respective layers of the shuttering panel deconstruction floor 2, a support installation floor 3, a modesty panel installation floor 4, and a PC strand winding working floor 5 in this order from a downside, and a concrete skeleton 7 is constructed sequentially from a lower side while elevating the whole. The shuttering panel deconstruction floor 2 serves as a working space for deconstructing a shuttering panel 13, a discharging stage 21 for mounting the deconstructed shuttering panel is extended in the shuttering panel deconstruction floor, and a horizontal floor face position is made to come to an outside of respective outermost edges of the shuttering panel installation floor 4 and the support installation floor 3. The discharging stage 21 is constituted to determine properly an under-skirt length, a width and an installation position, so as to suspend smoothly the shuttering panel 13 mounted on a floor face of the stage 21, without interfering with the shuttering panel installation floor 4 and the support installation floor 3. COPYRIGHT: (C)2011,JPO&INPIT |