发明名称 CONSTRUCTION METHOD BY CONCRETE LINING IN PARALLEL WITH EXCAVATION, WORKING PLATFORM FOR REINFORCEMENT AND WATERPROOFING WORK AND LINING FORM FOR POURING LINING CONCRETE
摘要 PURPOSE: A tunnel construction method through simultaneous excavation and lining construction, a working truck, and a lining form used for a tunnel construction method are provided to reduce construction times through simultaneous excavation and lining construction and improve construction safety. CONSTITUTION: A tunnel construction method through simultaneous excavation and lining construction comprises following steps. Forward excavation is carried out. The excavation is continuously carries out and a working truck is placed in a section in which the excavation is completed, so waterproof construction is carried out and a lining bar is placed. The working truck is moved forward, and the waterproof construction and the arrangement work of lining bars are continuously carried out. A lining form is arranged in the section where the lining bar is arranged, so the lining concrete is poured and cured. The lining form is moved forward.
申请公布号 KR101014779(B1) 申请公布日期 2011.02.14
申请号 KR20090097703 申请日期 2009.10.14
申请人 E-HWA INDUSTRY CO., LTD.;SAMSUNG C&T CORPORATION 发明人 KIM, JANG DEUK;RYOO, YEUNG SUN;MOON, BYOUNG TAG;KIM, JEONG WON;KIM, SANG IL
分类号 E21D9/00;E21D11/40 主分类号 E21D9/00
代理机构 代理人
主权项
地址