摘要 |
<p>In a method and equipment for continuous sintering of pelletized mineral material, a partition wall (7, 8) arranged between two adjacent cooling chambers (4, 5; 5, 6) is in the height direction placed at a distance from the pellet bed (2), so that in between the partition wall (7, 8) and pellet bed (2), there is left a gap (s) that allows gas to flow between two adjacent cooling chambers (4, 5; 5; 6) through the gap (s) in order to equalize the pressure between the cooling chambers.</p> |