摘要 |
<p>The method involves installing a usage value recording units (V1-V16) e.g. water meter, and a central receiving unit (ZE) at predetermined locations (S1, S2) in or at a building (1). A position is determined for placing a local receiving unit. Data transmission connection e.g. internet, is established between the local receiving unit and the central receiving unit, and another data transmission connection is established between the local receiving unit and the usage value recording units, in the position. An installation mode is activated in the recording units and receiving units.</p> |