PROBLEM TO BE SOLVED: To increase generated electrical energy while alleviating restrictions on the construction of a geothermal power plant. SOLUTION: After having taken the water of a river 7 brought from an intake pipe 12 into a steam condenser 5 as cooling water, the water is poured in a geothermal generation well 10 via a water poring pipe 9. Steam and hot water which are blown off from the geothermal generation well 10 are taken into a steam well 3. Then, the steam and the hot water are sent to a turbine 1 to rotate the turbine 1. After making a generator 2 generate electric power, the steam and the hot water are sent to the steam condenser 5 to make them subjected to heat exchange with the cooling water, thereby being cooled and condensed. COPYRIGHT: (C)2011,JPO&INPIT
|