摘要 |
PURPOSE: A wind power generation system using building wind and a method for installing the same are provided to enable wind power generation at low costs and high efficiency by installing a wind power generator on a spot in which wind energy is obtained at upmost. CONSTITUTION: A wind power generation system using building wind and a method for installing the same comprise following steps. Database is formed by analyzing wind direction and wind speed on several spots within one or more buildings. The wind power generation amount of a wind power generator is predicted based on database(S150). Based on the predicted wind power generation amount, the installation position of the wind power generator is determined(S160). |