摘要 |
<p>An efficient maintenance procedure is provided. An arranging means (2) arranges information collecting work in order of processing priority based on data (5a) and data (6a). An assigning means (3) preferentially generates data (8) assigned as information collecting work corresponding to a solving measure from information collecting work with high use priority of the solving measure at every type of the solving measure based on the number of issues of data (6a). A display means (4) displays a procedure for terminating maintenance by showing that the processing of information collecting work is to be performed in order of processing priority, giving a previously prepared condition with respect to an exe cution result of information collecting work and performing the solving measure assigned to information collecting work performed when the condition is satisfied.</p> |