摘要 |
Various embodiments are described herein to address the need for providing substantially reduced PTT call setup delays. Modifications to channel assignment request messaging (400), such as an IS-2000 Reconnect Message and an IS-2000 Origination Message, are described. In addition, the use of common control channel signaling (e.g., 201), changes to page response messaging (e.g., 301) and new uses for A9-Short Data Delivery messaging (e.g., 203 and 303) are described. Embodiments incorporating some or all of these protocol changes, can provide reduced end-to-end call setup time for PTT as it presently exists in IS-2000 systems.
|