发明名称 Method for extension of existing bridge, involves assembling cantilever brackets to form extension cross-section, removing existing road surface on part of bridge, concreting cross-section, making seal, and building actual road surfaces
摘要 <p>The method involves installing struts between bars (6-9) of a bridge (1) over entire length of the bridge, and casting an external transverse prestressed concrete. Cantilever brackets are assembled to form an extension cross-section. The cantilever brackets are adjusted, and an existing road surface on a part of an existing bridge is removed. The extension cross-section is concreted, and a seal is made. Actual road surfaces (2-5) are built, and existing cantilevers (10, 11) are removed before mounting the cantilever brackets.</p>
申请公布号 DE102009026004(A1) 申请公布日期 2010.12.23
申请号 DE20091026004 申请日期 2009.06.19
申请人 BRANDAUER, FRANZ;BRAUN, MATTHIAS;KNORZ, SIEGFRIED;MEYFARTH, INGO HEINRICH FERDINAND;VOLTMANN, ECKHARD 发明人
分类号 E01D22/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址