发明名称 |
Method for extension of existing bridge, involves assembling cantilever brackets to form extension cross-section, removing existing road surface on part of bridge, concreting cross-section, making seal, and building actual road surfaces |
摘要 |
<p>The method involves installing struts between bars (6-9) of a bridge (1) over entire length of the bridge, and casting an external transverse prestressed concrete. Cantilever brackets are assembled to form an extension cross-section. The cantilever brackets are adjusted, and an existing road surface on a part of an existing bridge is removed. The extension cross-section is concreted, and a seal is made. Actual road surfaces (2-5) are built, and existing cantilevers (10, 11) are removed before mounting the cantilever brackets.</p> |
申请公布号 |
DE102009026004(A1) |
申请公布日期 |
2010.12.23 |
申请号 |
DE20091026004 |
申请日期 |
2009.06.19 |
申请人 |
BRANDAUER, FRANZ;BRAUN, MATTHIAS;KNORZ, SIEGFRIED;MEYFARTH, INGO HEINRICH FERDINAND;VOLTMANN, ECKHARD |
发明人 |
|
分类号 |
E01D22/00 |
主分类号 |
E01D22/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|