发明名称 |
MAIN BEAM CONNECTION METHOD OF CONSTRUCTION FOR CONSTRUCTION WHICH TOOK TRAFFIC PROCESSING INTO CONSIDERATION |
摘要 |
PURPOSE: A method for connecting a main girder in consideration of traffic management is provided to reduce the amount of middle piles by extending intervals between middle piles. CONSTITUTION: A method for connecting a main girder in consideration of traffic management is as follows. A main girder support(12) is installed in the ground(10). A temporary foundation(14) is installed in the bottom of the main girder support. Main girders(28) are installed in the main girder support and are connected to steel plates(30) using high-tension bolts. Deck plates(34) with uniform size and shape are installed on the main girders. |
申请公布号 |
KR20100133163(A) |
申请公布日期 |
2010.12.21 |
申请号 |
KR20090051908 |
申请日期 |
2009.06.11 |
申请人 |
CONSTRUCTION & TRANSPORTATION TECHNOLOGY CO.KR |
发明人 |
LEE, YOUNG HO |
分类号 |
E01D21/00;E01D2/00;E01D19/12 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|