发明名称 Data center batch job quality of service control
摘要 <p>A machine-controlled method can include determining an extended interval quality of service (QoS) specification for a batch job and determining a remaining data center resource requirement for the batch job based on the extended interval QoS specification. The machine-controlled method can also include determining an immediate QoS specification for the batch job based on the remaining data center resource requirement.</p>
申请公布号 EP2261845(A1) 申请公布日期 2010.12.15
申请号 EP20100164075 申请日期 2010.05.27
申请人 PALO ALTO RESEARCH CENTER INCORPORATED 发明人 GREENE, DANIEL H.
分类号 G06Q10/00 主分类号 G06Q10/00
代理机构 代理人
主权项
地址