Method for manufacturing arranged tank body to supply water for bomber helicopter during fire fighting in forest, involves equipping ends with fixing perforations and holes, and filling and draining tank body by standardized connections
摘要
<p>The method involves equipping ends with fixing perforations and holes. The holes are fixed on a central plate. Adjustable arms are received by the fixing perforations from the central plate. The holes are positioned on other perforations. A positive or negative double ray stave guide is formed by a base. The positive or negative double ray stave guide is maintained by hoopings or external maintenance segments comprising clamp holes of fixation units. A tank body (1) is filled and drained by standardized connections.</p>