摘要 |
<P>PROBLEM TO BE SOLVED: To provide an receiving inspection device for preventing deficiency in each lane as much as possible. <P>SOLUTION: A carriage-in time inspection processing part 22 inspects the quantity of delivery by comparing the total of the quantity of carriage-in of component boxes recorded in delivery result information within a prescribed period with the quantity of the component boxes set in ordering plan information for each component box. When carrying out the component boxes from a lane to the assembly line according to a production plan, a carriage-out time inspection processing part 23 inspects the quantity of carriage-in to the lane by comparing the quantity of the component boxes to be carried out from the lane according to delivery plan information with the quantity of component boxes actually carried in to the lane. A notification part 24 outputs the notification of erroneous carriage-in when the shortage of the component boxes is detected in inspection processing by the inspection processing parts 22 and 23. <P>COPYRIGHT: (C)2011,JPO&INPIT |