发明名称 EQUIPMENT REPLACEMENT METHOD OF POWER GENERATION MONITORING CONTROL SYSTEM
摘要 <p><P>PROBLEM TO BE SOLVED: To shorten the operation stop time of a power generation monitoring control system when replacing a computer and an PIO device existing in the power generation monitoring control system with a new computer and PIO device. <P>SOLUTION: An existing power generation monitoring control system 1 is provided with: an existing computer 110; an existing PIO board 120; and on-site equipment 130. The existing PIO board 120 is provided with: an existing PIO device 121 and a terminal stand 122 connected by wiring 123. When the existing computer 110 and the existing PIO device 121 are replaced, a replacement unit 3 having the newly installed computer 210 and the newly installed PIO device 221 is prepared (S1), and a testing device 270 is connected to the newly installed PIO device 221 (S2). The operation of the replacement unit 3 is confirmed by using the testing device 270 (S3). The operation of the power generation monitoring control system 1 is stopped (S4). The wiring 123 is removed from the existing PIO device 121 (S5), and connected to the newly installed PIO device 221 (S6). <P>COPYRIGHT: (C)2011,JPO&INPIT</p>
申请公布号 JP2010267057(A) 申请公布日期 2010.11.25
申请号 JP20090117452 申请日期 2009.05.14
申请人 TOSHIBA CORP 发明人 MOGI KENICHI;FUKUSHIMA MASAKI;KAMIYAMA MASAHIKO;ASHIHARA MUTSURO;SASAKI TOSHIYA;NAGAHISA KOJI
分类号 G06F1/00 主分类号 G06F1/00
代理机构 代理人
主权项
地址