发明名称 HYBRID WOBBE CONTROL DURING RAPID RESPONSE STARTUP
摘要 PROBLEM TO BE SOLVED: To provide a method and a device for minimizing starting time of a gas turbine. SOLUTION: According to one aspect, this invention relates to a method of controlling a transition of a gas turbine (10). This method includes receiving a request for driving the gas turbine (10) by an increased load. The increased load is greater than a load being driven by the gas turbine (10) when receiving the request. This method further includes determining whether or not the temperature of fuel to be ignited within a combustor (20) of the gas turbine (10) is lower than the target temperature of the fuel to be introduced into the combustor (20) for driving the increased load. This method also includes controlling the introduction of an additive into the combustor (20) of the gas turbine (10) when the temperature of the fuel is lower than the target temperature, to attain a suitable Wobbe Index of a fuel combination of the fuel and the additive, to promote a substantially continuous transition of the gas turbine (10) to driving in the increased load. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2010261454(A) 申请公布日期 2010.11.18
申请号 JP20100104696 申请日期 2010.04.30
申请人 GENERAL ELECTRIC CO <GE> 发明人 SNIDER DAVID AUGUST
分类号 F02C9/00;F01D19/00;F02C3/30;F02C6/18;F02C7/00;F02C7/22;F02C7/224;F02C7/26;F02C9/28 主分类号 F02C9/00
代理机构 代理人
主权项
地址