摘要 |
<p><P>PROBLEM TO BE SOLVED: To lower the possibility of a reception error of "Zero Grant" at a mobile station UE#1 as a current scheduling target during switching of a mobile station UE as a scheduling target. <P>SOLUTION: In a radio base station NodeB, an AG transmission unit 12 is configured to transmit the same "Zero Grant" a plurality of times to a first mobile station UE#1 as a scheduling target in a current scheduling section before a next scheduling section starts. <P>COPYRIGHT: (C)2011,JPO&INPIT</p> |