发明名称 METHOD FOR PROTECTING PILE HOLE WALL
摘要 PROBLEM TO BE SOLVED: To perform the protection of a hole wall concurrently with the excavation of a pile hole for a cast-in-place pile. SOLUTION: A plurality of cylindrical pipes (14), which are smaller in diameter than the pile hole and the lengths of which are smaller in dimension than or equal in dimension to the depth of an excavated section, are connected together and dropped in along the hole wall (15), concurrently with the operation of excavating the pile hole for the cast-in-place pile; and the hole wall and the cylindrical pipes are firmly attached to one another by filling a gap between the hole wall and the cylindrical pipes with a filler (16). COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2010248714(A) 申请公布日期 2010.11.04
申请号 JP20090096628 申请日期 2009.04.13
申请人 EAST JAPAN RAILWAY CO 发明人 ISHIBASHI TADAYOSHI;OSAKO KATSUHIKO;YOSHIDA KOICHI;OBA AKIRA;TANIGUCHI YOSHINORI;TAKEYA TSUTOMU;IKEMOTO HIROFUMI;WATANABE AKIYUKI;TANIGUCHI MISA
分类号 E21D1/00;E21D1/08;E21D5/10;E21D11/00 主分类号 E21D1/00
代理机构 代理人
主权项
地址