PROBLEM TO BE SOLVED: To provide a method for completing the construction of a super-insulated house with its wall insulation thickness of 200 mm or larger without causing reduction in an indoor residential floor space caused by an increase in wall thickness. SOLUTION: In the method, a basic premium section 21 is integrally-formed at a time in a basic building stage. Furthermore, the combination of a limb supporting vertical post 7 and a reinforcing board 9 is separately prepared. Such a combination of the limb supporting vertical post 7 and the reinforcing board 9 is joined to two or more columns 3 erected on a groundwork 2 firmly-mounted to a foundation 1. An insulator supporting baseplate 14 is fixed on the bottom. Then the space created by combining all of these parts is filled with an insulating material 20 to construct the highly-insulated wall. COPYRIGHT: (C)2011,JPO&INPIT
|