摘要 |
PURPOSE: A construction method for temporary facilities using connection between soldier pile and sheet pile is provided to efficiently construct a soldier pile and to improve structural stability. CONSTITUTION: A construction method for temporary facilities using connection between soldier pile and sheet pile is as follows. Earth retaining wall temporary facilities are constructed using U-shaped sheet pile(28). When constructing the earth retaining wall temporary facilities, the solider pile is inserted to bedrock to a designated drilling depth at regular intervals. The inside of a soldier pile(23) and the soldier pile are excavated after connecting L- sheet pile(27) and U-sheet pile between the soldier piles. |