摘要 |
<p>The method involves inserting a locking ring pin (3) in the joining connection openings (7.1,7.2) of the steel components (1,2) to be connected. The locking ring (4) is formed in the closed grooves (3.2) of the locking ring pin in the scope of a positioning process. The locking ring pin is heated to a temperature after insertion into the joining connection openings. The locking ring pin and the locking ring are made of steel, particularly carbon, silicon, manganese, phosphorus, sulfur, chromium, copper, and boron.</p> |