发明名称 |
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN |
摘要 |
FIELD: oil and gas industry. ^ SUBSTANCE: method consists in high frequency electromagnetic action on the formation drilled at least with one production well through mutually insulated casing string and tubing string. At that, high frequency electromagnetic action is performed through horizontal well. Horizontal part of the well bore is electrically insulated from its vertical part by cutting some part of casing string with further sealing. Horizontal part of the well bore is electrically connected to tubing string. ^ EFFECT: increasing oil recovery factor of formation and well flow rate. ^ 1 dwg |
申请公布号 |
RU2399753(C2) |
申请公布日期 |
2010.09.20 |
申请号 |
RU20070128512 |
申请日期 |
2007.07.24 |
申请人 |
GOU VPO BASHKIRSKIJ GOSUDARSTVENNYJ UNIVERSITET, BASHGU |
发明人 |
KOVALEVA LIANA ARONOVNA;NASYROV NUR MUTAGAROVICH;ZINNATULLIN RASUL RASHITOVICH;KHAJDAR AZAT MARATOVICH;DAVLETBAEV AL'FRED JADGAROVICH |
分类号 |
E21B43/24 |
主分类号 |
E21B43/24 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|