摘要 PROBLEM TO BE SOLVED: To provide an economical long-sized forepoling construction method for enabling reuse (repetitive use) of a guide pipe. SOLUTION: In this long-sized forepoling construction method, the guide pipe 11 is installed obliquely and upward in the front of a tunnel in the direction of tunnel excavation from a cutting face 71 in the vicinity of a boundary of the cutting face 71 in a tunnel cavity part 70 and an internal wall face 72 of the tunnel cavity part 70, and then a long pipe 12 having a smaller diameter than that of the guide pipe is installed on the natural ground 50 through the guide pipe 11 to reinforce the natural ground 50. A guide pipe constituted by connecting a plurality of separable unit pipes 11A mutually in the longitudinal direction is used as the guide pipe 11 in this construction method. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010203125(A) 申请公布日期 2010.09.16
申请号 JP20090049031 申请日期 2009.03.03
申请人 KUMAGAI GUMI CO LTD 发明人 HIROSE TOSHIBUMI;IWANAGA SHIGEJI
分类号 E21D9/04 主分类号 E21D9/04
代理机构 代理人
主权项
地址