发明名称 THE EXCAVATION METHOD OF CONCRETE TUNNEL CONSTRUCTION
摘要 PURPOSE: A concrete tunnel structure excavation method is provided to prevent damage to a tunnel structure by minimizing the friction between the ground and the tunnel structure and the earth pressure applied to the tunnel structure. CONSTITUTION: A concrete tunnel structure excavation method comprises steps of: excavating two sides of a construction site to form a propulsion base(10) and a destination base(20) of predetermined depth, setting a plurality of propulsion jacks(30) in the propulsion base to pressing a tunnel structure(60) into the ground, forming a tip structure(40) in front of the tunnel structure to lead the insertion of the tunnel structure into the ground, coupling a plurality of guide pipes(50) to the specified positions of the tip structure, pressing and advancing the tip structure, the tunnel structure, and the guide pipes into the ground, and successively positioning tunnel structures and guide pipes until the tunnel structure reaches the destination base.
申请公布号 KR20100099068(A) 申请公布日期 2010.09.10
申请号 KR20100018662 申请日期 2010.03.02
申请人 WI, JOON BOK 发明人 WI, JOON BOK
分类号 E21D9/06;E21D9/08 主分类号 E21D9/06
代理机构 代理人
主权项
地址