摘要 |
PURPOSE: A method for filling a stepped part of a building is provided to reduce construction costs and construction period by installing a filler part by recycling a filling member in which concrete and soil are mixed. CONSTITUTION: A method for filling a stepped part of a building is as follows. A ground(E) of a space in which foundation is arranged is dug. A first mold is established in the boundary of the installation space of the installation space section of a first building foundation and a filler part(300). The installation space of the filler part is filled with the filler member. A steel reinforcing bar(R) is arranged in the installation space of the first building foundation. The concrete is poured in the installation space of the first building foundation. The concrete is poured in the installation space of the second building foundation. |