摘要 |
A method for planning the construction of a brick wall, a brick allocating program, and a brick allocating system for allocating bricks, metal plates, and bolts and nuts in a DUP construction method, the method comprising the steps of specifying lattice-like XY coordinates forming square grids, setting odd stage tightening grids (.alpha.) and even stage tightening grids (.beta.) alternately in X- and Y-directions, positioning the bricks (10) at the end parts of a wall body on reference grids (.gamma.) so that the first square half parts of the bricks having bolt insert holes (30) match the odd stage or the even stage tightening grids, arranging, in order, the odd stage or even stage bricks starting at the reference grids, and disposing the metal plates so that at least one bolt hole (53) in the metal plate (50) on each stage is positioned at the odd number stage or the even number stage tightening grids.
|