摘要 |
<P>PROBLEM TO BE SOLVED: To provide a storage hot water supply system capable of suppressing heat release loss from a hot water storage tank while suppressing shortage of hot water in the hot water storage tank. <P>SOLUTION: Start time is determined so that a sum of heat quantity which can be boiled by a heating means 2 from the start time to completion of a predicting hot water supply load and heat storage amount in the hot water storage tank 1 at the start time is larger than an integrated value of the predicting hot water supply loads from current time to completion of the predicting hot water supply load, even with respect to each predicting hot water supply load from current time to termination of a unit period. <P>COPYRIGHT: (C)2010,JPO&INPIT |