摘要 |
PURPOSE: A concrete block for paving a bicycle road and a construction method using the same are provided to prevent damage to the concrete block by flowing water through drain holes formed in the block. CONSTITUTION: A concrete block for paving a bicycle road comprises a middle block(100) and a finishing block(200). The middle block has a body(110), drain holes(111), and installation holes. The drain holes are vertically formed in the body. The installation holes are horizontally formed in the body. The finishing block has a body(210), drain holes(211), and installation holes. Strands(130) connect multiple middle blocks through the installation holes of the middle block and the finishing block. |