摘要 |
The manufacturing process of work top with sink including a work top 120 and a sink 122 stuck together comprises: a work top forming step 10; and a sink forming step 30 in which a sink forming uneven mold is attached to a sink opening 121a formed in the work top 120 and resin is injected into the uneven mold whereby the sink is formed and simultaneously stuck to the sink opening (FIG. 1).
|