发明名称 CONSTRUCTION METHOD OF A BRIDGE USING TEMPORARY INSTALLATION BRACING
摘要 PURPOSE: A bridge construction method using a temporary installation bracing replacing a cross beam is provided to construct a bridge by reducing the load of the superstructure of a bridge. CONSTITUTION: A bridge construction method using a temporary installation bracing replacing a cross beam(21) is as follows. A support girder, in which a diaphragm is included, is established on the top of the bridge post. A main girder(20b) has a temporary installation bracing. The shear strength of the main girder is reinforced. The concrete is poured in and forms the bottom plate. The temporary installation bracing is disassembled after the curing of the concrete.
申请公布号 KR20100076538(A) 申请公布日期 2010.07.06
申请号 KR20080134628 申请日期 2008.12.26
申请人 RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY 发明人 CHOI, BYUNG HO;HWANG, MIN OH
分类号 E01D21/00;E01D22/00;E04G11/50 主分类号 E01D21/00