摘要 |
A base station (122) establishes a data channel in an uplink between the base station (122) and a user equipment (110), establishes a control channel in the uplink between the base station (122) and the user equipment (110), and determines a gating configuration (420) associated with the control channel. The base station (122) also transmits the gating configuration (420) to the user equipment (110), receives a gated control signal (430), via the control channel, based on the gating configuration (420), and synchronizes time slots for signal bursts associated with the gated control signal (430) and time slots for data packets associated with the data channel. The base station (122) further schedules transmissions of the data packets based on the synchronized time slots, generates an absolute grant based on the scheduled transmissions of the data packets, and transmits the absolute grant to the user equipment (110). |