摘要 |
<P>PROBLEM TO BE SOLVED: To provide a method of construction to save the field work. Ž<P>SOLUTION: In the method of construction of a structure of a large video apparatus, as to a steel column, a beam, exterior and interior plates etc., each of both-end erecting face sections 1, an intermediate erecting face section 2, an intermediate horizontal face section 3, a horizontal roof face section 4, a horizontal floor face section 5, an erecting wall face section 6, a horizontal base section 7 etc., which are manufactured in a plant to the maximum extent possible, is unitized to minimize the fitting work at the field site, so that the construction period at the field site can be reduced and assembly accuracy can be improved. Ž<P>COPYRIGHT: (C)2010,JPO&INPIT Ž
|