摘要 |
System(s) and method(s) are provided to enable phased acceptance of a product as part of an acquisition contract. Phased acceptance establishes a set of one or more phases of product acceptance, each directed to grant approval of a set of specific aspects of the product based at least in part on one of quality of operation or functional performance. Operational and functional performance metrics that determine acceptance thresholds in each acceptance phase are negotiated between a vendor and a client. To protect investment, phased acceptance can include remedies as part of each phase of acceptance based at least on one of product operational or functional failures, or unavailable features vendor committed to during negotiation of performance metrics; the remedies include at least one corrective measures or liquidated damages. A Final acceptance phase is the last approval from client to vendor, and can be employed to close out the acquisition contract.
|