发明名称 STRUCTURE OF NEWLY-BUILT STRUCTURE USING EXISTING PILE AND EXISTING FOUNDATION, AND METHOD FOR CONSTRUCTING THE NEWLY-BUILT STRUCTURE USING EXISTING PILE AND EXISTING FOUNDATION
摘要 PROBLEM TO BE SOLVED: To enable the leveling of stress acting on a newly-built foundation from an existing pile. SOLUTION: The existing structure supported by the existing pipe 12 is removed except for the existing pile 12 and an existing foundation slab 13 which is arranged on the existing pile 12; a back-filling material 2 made of sand, gravel, crushed stones, an improvement body, etc. is laid on the remaining existing foundation slab 13; a newly-built mat slab 3 of a foundation of a newly-built structure 10 is arranged on the back-filling material 2; and the newly-built structure 10 is constructed. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010121372(A) 申请公布日期 2010.06.03
申请号 JP20080296710 申请日期 2008.11.20
申请人 SHIMIZU CORP 发明人 ISHIKAWA AKIRA
分类号 E02D27/28;E02D27/01;E02D27/12 主分类号 E02D27/28