摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide an air conditioning system, which allows a user to perform operation for forcedly removing the snow accumulated within an outdoor unit while staying indoors. <P>SOLUTION: In the air conditioning system 1, a control part 11 starts snow melting operation control when an execution instruction is manually input to the control part 11 from an indoor unit side. The execution instruction can be input through a remote control 13. Since high-temperature refrigerant discharged from a compressor 21 can be forcedly carried to an outdoor heat exchanger 23 by the snow melting operation control, snow melting can be performed, when the outdoor unit 2 is covered with snow, and snow is accumulated in the inside, without need for a user or service person to go outside. <P>COPYRIGHT: (C)2010,JPO&INPIT</p> |