摘要 |
PROBLEM TO BE SOLVED: To provide a method of placing a time-curable material by which leakage between a form and a side face of a foundation part is easily prevented. SOLUTION: In the method for placing the time-curable material on an upper surface of the foundation part, a first time-curable material is placed on an upper surface of the foundation part whose side face is surrounded by the form, and a second time-curable material having a higher slump flow value than that of the first time-curable material is placed on an upper surface of the first time-curable material. Accordingly, leakage of the time-curable material between the form and the side face of the foundation part is easily prevented and construction work of a sealing material is reduced. COPYRIGHT: (C)2010,JPO&INPIT |