发明名称 Pull planning for unserviceable parts in connection with on-demand repair planning
摘要 In one embodiment, planning repairs in response to demand in a multi-level repair network includes accessing a forecasted demand for serviceable parts at a repair location and, for each inspected unserviceable part at the location that is not repairable at the location: (1) planning a move of the part to an upstream repair location such that the part can be available for repair at the upstream location at an estimated earliest time; (2) estimating a latest time at which a repair of the part can begin at the upstream location to help satisfy the forecasted demand, according to the forecasted demand and the estimated earliest time, and planning a repair at the upstream location at the estimated latest time; and (3) re-planning the move, according to the start time of the repair, by modifying a move delivery time according to a repair start time and modifying a move start time according to the modified delivery time. The re-planned move start time is an estimated latest time at which the part can be moved to the upstream location for repair to help satisfy the forecasted demand.
申请公布号 US7711593(B2) 申请公布日期 2010.05.04
申请号 US20030691320 申请日期 2003.10.22
申请人 I2 TECHNOLOGIES US, INC. 发明人 ADGAONKAR AMOL B.;RAMMOHAN DEEPAK;BURKHARDT THOMAS;JAIN NIKHIL T.
分类号 G05B19/418;G06F9/46;G06Q10/00 主分类号 G05B19/418
代理机构 代理人
主权项
地址