发明名称 HYDROMETALLURGICAL PROCESS OF NICKEL OXIDE ORE
摘要 <p><P>PROBLEM TO BE SOLVED: To prevent wear of equipment, caused by an ore slurry, in a hydrometallurgical process for recovering nickel from a nickel oxide ore by a high pressure acid leaching process composed of an ore treatment step, a leaching step, a solid-liquid separation step, a neutralization step, a zinc removal step, a sulfurization step and a final neutralization step, and to provide a method for separating and recovering impurity components to reduce an amount of a final neutralization residue and contribute to resource recycling. <P>SOLUTION: The method includes at least one step selected from the following steps (A)-(C): (A) a step to separate and recover, by a physical separation method, particles composed of at least one kind selected from silica mineral, chromite or a magnesium silicate ore in ore slurry produced from the ore treatment; (B) a step to separate and recover, by a physical separation method, hematite particles in leaching residue slurry produced from the solid-liquid separation step; and (C) a step to subject a neutralization precipitate slurry produced from the neutralization step to the final neutralization treatment separately from the leaching residue produced from the solid-liquid separation step. <P>COPYRIGHT: (C)2010,JPO&INPIT</p>
申请公布号 JP2010095788(A) 申请公布日期 2010.04.30
申请号 JP20080303497 申请日期 2008.11.28
申请人 SUMITOMO METAL MINING CO LTD 发明人 NAKAI OSAMU;KOBAYASHI CHU;AOKI YUJI;OZAKI KEICHI;SHOJI HIROSHI;SHIBAYAMA KEISUKE;USHIO RYOZO;IDEUE ATSUSHI
分类号 C22B23/00;C22B3/04;C22B3/44 主分类号 C22B23/00
代理机构 代理人
主权项
地址