摘要 |
<P>PROBLEM TO BE SOLVED: To easily and rapidly perform preparation or correction of a schedule over all processes without requiring a vast calculation amount or a lot of time. <P>SOLUTION: A production physical distribution process plan preparation system 1 preparing a work schedule of a production physical distribution process includes: a DB server 70 for holding order information of a product, progress information, a restriction condition and a scheduling parameter used for the preparation of the work schedule of each process, and the work schedule of each process; management systems (11, 21, 31, 41, 51) for preparing the work schedule of each process from the order information, the progress information, and the work schedule by use of the restriction condition and the scheduling parameter; and a scheduling parameter update system 80 for updating the restriction condition and/or the scheduling parameter based on the order information, the progress information, and the work schedule about each process. <P>COPYRIGHT: (C)2010,JPO&INPIT |