发明名称 FORMWORK FOR PRECAST CONCRETE MEMBER INTEGRATING BEAM AND COLUMN-BEAM JOINT SECTION AND PRODUCTION PROCESS OF PRECAST CONCRETE MEMBER INTEGRATING BEAM AND COLUMN-BEAM JOINT SECTION USING THE FORMWORK
摘要 PROBLEM TO BE SOLVED: To provide a formwork for precast concrete member capable of reducing labor hour and cost of separately casting concretes of different strength, improving efficiency of production operation, and integrating the concretes. SOLUTION: The formwork 20 comprises a beam section formwork 22, a column-beam joint section formwork 24, and a partition member 26. The partition member 26 is inserted to or removed from a cast dividing section of casting spaces 36, 38 for beam concrete. The partition member 26 is equipped with a partition plate 44 and a plurality of sheet members 46. Each sheet member 46 bends in contact with a beam bottom bar T1 at a part where the beam bottom bar T1 is inserted so as to allow the beam bottom bar T1 to be inserted through a beam main bar insertion groove 4402, and every sheet member 46 is made to plug the beam main bar insertion groove 4402 except the ones where the beam bottom bar T1 is inserted. Also, each sheet member 46 is attached so that it may deform or shift in its upward extraction, allowing the beam bottom bar T1 a relative shifting in the beam main bar insertion groove 4402. COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010094914(A) 申请公布日期 2010.04.30
申请号 JP20080268439 申请日期 2008.10.17
申请人 FUJITA CORP;TECHNO MATERIAL:KK 发明人 TAKAMORI NAOKI;HAYASHI KAZUYA;SATO YUKIHIRO;SASAKI HITOSHI;MAEDA TAKAHIRO;HAYASHI MASAAKI
分类号 B28B7/24;B28B23/02;E04G9/10 主分类号 B28B7/24
代理机构 代理人
主权项
地址
您可能感兴趣的专利