摘要 |
A process for determining a route along more than two mutually consecutive preset path points with given connecting routes in-between. In this case, a plurality of connecting routes is given between at least one pair of two mutually consecutive path points. Respective costs and preferably also a respective time duration are assigned to each connecting route. In a first step of the process, a tree is generated which comprises edges and nodes connected by edges. Each node is assigned to a defined path point and each edge corresponds to a connecting route. The route is determined based on a selection of edges of the tree.
|