摘要 |
A method for erection of building facade followed by installation of filling elements at which mounting of façade is carried out from surface of inserted floor with implementation of sequential mounting of each floor. At that top support holders installed on inserted floor at outside of the building one installs vertically hollow guide posts, to the outer surfaces of those by means of inserts one attaches beams, at that mounting of posts and beams one performs in sequence, post-beam, and/or in parallel, post-post, beam-beam, after that one installs filling elements with following fixation of those, at that sealing elements are installed between the posts and beams and filling elements, and to inside of hollow posts one installs metal strips, and neighboring guide posts are jointed. The invention promotes decrease of labor intensity and costs of mounting operations. |