发明名称 WATER-INTAKE MANAGEMENT METHOD FOR SEAWATER IN ELECTRIC POWER PLANT INTAKE
摘要 <P>PROBLEM TO BE SOLVED: To alleviate an operator's load, by inhibiting monitoring failure by alarm set failure, by omitting an effort for watch alarm time setting by the operator, while carrying out arithmetic operation of an ebb tide time of day which is important for water-intake of seawater and notifying the operator of the time. <P>SOLUTION: Geographic position information on an electric power plant, position designation information which specifies a geographic specific position, and time information at the time of the ebb tide or high tide about each position information already stored in data, are stored in a database 13. On the basis of each extracted data, tide level for every time of day in the electric power plant is displayed on an output device 22, and when tide level will be low, the ebb tide time is reported. <P>COPYRIGHT: (C)2010,JPO&INPIT
申请公布号 JP2010091507(A) 申请公布日期 2010.04.22
申请号 JP20080263662 申请日期 2008.10.10
申请人 CHUGOKU ELECTRIC POWER CO INC:THE 发明人 KUBO CHIAKI;KUNIHIRO YUKIO;FUJIWARA KOICHI;YAMAOKA ISAMU;SUENAGA HIROSHI;SHIMIZU CHIEKO
分类号 G04G99/00 主分类号 G04G99/00
代理机构 代理人
主权项
地址