发明名称 COMBINING GEOMECHANICAL VELOCITY MODELING AND TOMOGRAPHIC UPDATE
摘要 A method for updating a velocity model of a subsurface of the earth is described herein. A tomographic update to the velocity model of the subsurface may be performed to generate a tomographic velocity model update. A geomechanical velocity model update of the subsurface may be calculated. The geomechanical velocity model update may be combined with the tomographic velocity model update.
申请公布号 WO2009149323(A3) 申请公布日期 2010.04.15
申请号 WO2009US46365 申请日期 2009.06.05
申请人 GECO TECHNOLOGY B.V.;SCHLUMBERGER CANADA LIMITED;SENGUPTA, MADHUMITA;BACHRACH, RAN;OSYPOV, KONSTANTIN 发明人 SENGUPTA, MADHUMITA;BACHRACH, RAN;OSYPOV, KONSTANTIN
分类号 G06F9/44;G06F17/10 主分类号 G06F9/44
代理机构 代理人
主权项
地址