发明名称 PILE CONSTRUCTION METHOD USING FOUNDATION PILE AND DUAL HOLLOW REINFORCING PILE
摘要 PURPOSE: A pile construction method using a hollow foundation pile and a double closing steel pipe is provided to minimize waste materials of a steel pipe pile, and to improve resistance to bending moment and shearing force. CONSTITUTION: A pile construction method using a hollow foundation pile and a double closing steel pipe is as follows. Hollow foundation piles(110) are buried in the ground, and the top ends(110a) are exposed. Double closing steel pipes(120) are fitted into the foundation piles to reinforce the top ends of the foundation piles. A gap between the inner surface of the foundation piles and the outer surface of the double closing steel pipes is filled with expansion concrete(M).
申请公布号 KR100952199(B1) 申请公布日期 2010.04.09
申请号 KR20090025878 申请日期 2009.03.26
申请人 DAESAN CIVIL TECH CO., LTD.;LEE, HYUNG HOON 发明人 LEE, HYUNG HOON
分类号 E02D5/24;E02D5/28;E02D27/12 主分类号 E02D5/24