摘要 |
PROBLEM TO BE SOLVED: To save a space for a processing device, and to shorten scheduling time. SOLUTION: The conveyance device 30 conveys an optical element material A before press molding and an optical element B after press molding, between a plurality of press-molding devices 20 and a pallet 19. A conveyance head 15 mounts a supply suction tube 13 for holding the optical element material A and a discharge suction tube 14 holding the optical element B. The conveyance head 15 is moved by the combination of linear motions in an X-axis stage 10, a Z-axis stage 17, and a Y-axis stage 16. Therefore, teaching work in conveyance operation of the conveyance device 30 and the press molding device 20 is facilitated to shorten the scheduling time, and the need for turning of the arm is eliminated to reduce a mounting space. COPYRIGHT: (C)2010,JPO&INPIT
|