发明名称 Total cost based checkpoint selection
摘要 A method, system, and computer usable program product for total cost based checkpoint selection are provided in the illustrative embodiments. A cost associated with taking a checkpoint is determined. The cost includes an energy cost. An interval between checkpoints is computed so as to minimize the cost. An instruction is sent to schedule the checkpoints at the computed interval. The energy cost may further include a cost of energy consumed in collecting and saving data at a checkpoint, a cost of energy consumed in re-computing a computation lost due to a failure after taking the checkpoint, or a combination thereof. The cost may further include, converted to a cost equivalent, administration time consumed in recovering from a checkpoint, computing resources expended in taking a checkpoint, computing resources expended after a failure in restoring information from a checkpoint, performance degradation of an application while taking a checkpoint, or a combination thereof.
申请公布号 US2010088494(A1) 申请公布日期 2010.04.08
申请号 US20080244261 申请日期 2008.10.02
申请人 INTERNATIONAL BUSINESS MACHINES CORPORATION 发明人 ELNOZAHY ELMOOTAZBELLAH N.
分类号 G06F9/312 主分类号 G06F9/312
代理机构 代理人
主权项
地址