摘要 |
PURPOSE: An improvement surface processing method of construction of the very soft ground is provided to reduce construction costs and to make ground improvement. CONSTITUTION: An improvement surface processing method of construction of the very soft ground using a hot wire comprises follows. A hot wire(50) is arranged on the upper surface of a reclaimed ground in order to be separated to the inter predetermination interval and depth. Heat is supplied to the hotwire in order to dry the upper surface of the reclaimed ground. |